Ken Mattingly was moved from the help crew into parallel training with Anders as backup CMP in the event Apollo eleven was delayed past its meant July start day, at which level Anders might be unavailable.[59] On arrival for the Vertical Assembly Developing, Every stage was inspected in the https://apollo208529.worldblogged.com/33041038/the-2-minute-rule-for-ambiq