The soil investigation report handed to your structural engineer for the design of pile foundation purpose must incorporate the embedment duration on the piles, the suggested measurements from the pile, the Harmless Operating load of each pile dimension, along with other details Which may be needed for the structural engineer https://emilyk802efe4.ktwiki.com/user